Description
Course 3 - Station Preparation & Installation
In this course:
You will discover the steps required to prepare for and complete the installation of your station, including tips, tricks and key considerations.
Estimated Learning Time: 60 min
Topics covered:
Component Preparation
1. Unboxing - iMETOS 3.3
2. Unboxing - ECO D3
3. Knowledge Check
Updating the Firmware
4. Firmware Updates - iMETOS 3.3
5. Firmware Updates - ECO D3
6. Knowledge Check
SIM Cards
7. Understanding SIM cards for your devices
8. Knowledge Check
Device Set Up in FieldClimate
9. Adding a station to FieldClimate
10. Knowledge Check
Site Locations & Installations
11. Confirming Connectivity - Local
12. Station Assembly
13. Validating Station Functionality
14. Knowledge Check
Soil Moisture Sensor Installations
15. Soil Moisture Sensor Installation
16. Knowledge Check
Confirming Communication To Pessl
17. Confirming Connectivity - Remote
18. Knowledge Check
Certification
19. Certification Exam
Objectives
By the end of this course you will be able to:
-
Unpack and prepare your station for installation
-
Assemble and install your station
-
Identify and install a variety of common soil moisture sensor types
-
Test and validate station functionality both locally and remotely
Certificate
By completing/passing this course, you will attain the certificate iMetos Stations
The contents of this proprietary Metos learning system are copyright-protected and available solely for your learning and reference purposes. Further reproduction, distribution, transmission, or dissemination is strictly prohibited without expressed permission from the copyright owner(s). You may not distribute, record, email, stream or otherwise communicate these contents and materials to any other person.
Shopping Cart
Your cart is empty